European Grid Queue Report·November 2026·Issue 01

1,215 GW requested, concentrated in Italy, Germany and Sweden.

Our first monthly reading of the connection queues and capacity maps Europe's grid operators now have to publish. 3 countries account for 75% of all requested capacity we can measure. Signed contracts are not in this figure: they count as Reserved.

Data as of 18 November 2026192 operator datasets280,095 substations and areas
Total requested
1,215 GW
19 countries
Italy, all requests
708 GW
Terna Econnextion
Italian data-centre requests
108 GW
47 GW in Lombardia
French substations with no capacity available
51%
of 3,818 postes sources
00From our daily archive

What changed since the last reading

Operators overwrite their maps; we keep every snapshot. This is the part of the report nobody else can write: which sites gained or lost capacity, and which queues grew.

What changed93 sites changed in 13 publications · since 16 Nov 2026
01Requested capacity by country, split by connection type

Where the requests are

The largest requested total we can measure is in Italy (708 GW), followed by Germany (128 GW) and Sweden (74.0 GW). These are not like-for-like: some operators publish every request received, others only requests with an offer. Accepted offers and contracts count as Reserved, so the UK and Ireland, whose registers hold contracts, are not in this ranking. We take, per country, the single largest consistent publication and never add transmission and distribution queues together.

GenerationDemandStorage
  1. 01
    ItalyTerna (Econnextion)
    708 GW
  2. 02
    Germany50Hertz
    128 GW
  3. 03
    SwedenEllevio
    74.0 GW
  4. 04
    SpainRed Eléctrica
    72.0 GW
  5. 05
    AustriaAPG
    58.9 GW
  6. 06
    FranceRTE (ODRE)
    53.6 GW
  7. 07
    RomaniaTranselectrica
    27.0 GW
  8. 08
    NorwayStatnett
    25.6 GW
  9. 09
    NetherlandsNetbeheer Nederland (DSOs)
    21.1 GW
  10. 10
    BAElektroprenos BiH
    16.0 GW
  11. 11
    PolandEnerga Operator
    13.8 GW
  12. 12
    LithuaniaLitgrid
    6.4 GW
  13. 13
    SerbiaEMS
    3.9 GW
  14. 14
    United KingdomNGED
    2.0 GW
  15. 15
    LuxembourgCreos
    1.8 GW
  16. 16
    PortugalE-REDES
    960 MW
  17. 17
    CroatiaHEP ODS
    802 MW
  18. 18
    LatviaSadales tīkls
    572 MW
  19. 19
    MoldovaMoldelectrica
    0.4 MW
02Queue per region, top 3 per country

The most congested regions

Regional figures show where requests pile up. Southern Italy dominates on volume, driven by solar and stand-alone batteries in Puglia and Sicilia. In Sweden, the load queue in the north reflects industrial electrification and data centres.

  1. 01
    PugliaItaly
    172 GW
  2. 02
    SiciliaItaly
    117 GW
  3. 03
    LombardiaItaly
    72.2 GW
  4. 04
    Norrbottens länSweden
    15.7 GW
  5. 05
    Nouvelle-AquitaineFrance
    15.5 GW
  6. 06
    Castilla y LeónSpain
    11.3 GW
  7. 07
    Kronobergs länSweden
    10.5 GW
  8. 08
    Västernorrlands länSweden
    10.1 GW
03Terna connection requests by technology

Italy: batteries and data centres join the line

Italy's queue of 708 GW is no longer a renewables story alone. Stand-alone storage requests total 252 GW, and data-centre requests 108 GW, of which 47 GW in Lombardia. Most requests will never be built, but each one occupies a study slot and shapes where Terna plans new lines.

252 GW
Stand-alone storage
138 GW
Solar
108 GW
Data centres
103 GW
Onshore wind
62 GW
Offshore wind
16 GW
Solar-paired storage
12 GW
Other demand
Data-centre requests by region
  1. 01
    Lombardia
    47.3 GW
  2. 02
    Piemonte
    14.6 GW
  3. 03
    Lazio
    13.9 GW
  4. 04
    Puglia
    8.1 GW
  5. 05
    Veneto
    7.4 GW
  6. 06
    Emilia-Romagna
    6.2 GW
04Per country, as published

Largest requests per site

At site level the picture is sharper. In France, Caparéseau lists queued renewable capacity per substation under the regional S3REnR schemes.

Austria
APG
  1. 01
    Niederösterreichload
    14.1 GW
  2. 02
    Niederösterreich
    12.2 GW
  3. 03
    Steiermarkload
    4.0 GW
  4. 04
    Steiermark
    4.0 GW
  5. 05
    Oberösterreichload
    3.6 GW
Bosnia and Herzegovina
Elektroprenos BiH
  1. 01
    Bosnia and Herzegovina – Solarne Elektrane
    8.3 GW
  2. 02
    Bosnia and Herzegovina – Vjetroelektrane
    3.4 GW
  3. 03
    Bosnia and Herzegovina – Termoelektrane
    1.8 GW
  4. 04
    Bosnia and Herzegovina – Postrojenja Za Skladištenje Električne Energijestorage
    1.1 GW
  5. 05
    Bosnia and Herzegovina – Hibridna Postrojenja
    883 MW
Germany
50Hertz
  1. 01
    Eula (EU)load
    5.5 GW
  2. 02
    Altentreptow Süd (ATS)
    5.2 GW
  3. 03
    Altentreptow Süd (ATS)load
    5.2 GW
  4. 04
    Eula (EU)
    4.4 GW
  5. 05
    Graustein (GRS)
    3.8 GW
Netherlands
TenneT NL
  1. 01
    Noord-Hollandload
    3.0 GW
  2. 02
    Flevopolder, Utrecht en Gelderland
    2.1 GW
  3. 03
    Limburgload
    1.7 GW
  4. 04
    Limburg
    1.6 GW
  5. 05
    Flevopolder, Utrecht en Gelderlandload
    1.0 GW
05Share of published sites with no capacity available

How full are the grids?

Queue size is one half of the story; the other is how many substations can still take a new connection at all. Of the countries that publish headroom per site, Bulgaria has the highest share of sites with no capacity left (87%). In Germany, the first DSO allocation maps classify 90% of 599 substations as low capacity.

Bulgaria
87%
Germany
87%
Spain
79%
Türkiye
57%
Switzerland
54%
Denmark
54%
Luxembourg
52%
Austria
51%
France
51%
Portugal
49%
Poland
46%
Ireland
46%
Netherlands
42%
Croatia
39%
Lithuania
36%
Belgium
33%
Czechia
30%
United Kingdom
23%
Norway
22%
Latvia
20%
Slovakia
16%
Hungary
14%
Finland
13%
Greece
4%
Malta
2%
Sweden
1%
Slovenia
0%
None availableLimitedAvailable

The Netherlands publishes status per supply area rather than megawatts: 311 of 563 areas have a waiting list for new demand connections, with 8.1 GW queued in those areas alone.

06How to read these numbers

Method and caveats

  • All figures are taken from operator publications as archived on 18 November 2026. They are indicative and non-binding.
  • Requested means applied for or offered. Accepted offers and signed contracts count as Reserved and are not in these totals. What each operator publishes differs; the sources page says what its figures hold.
  • We never add transmission and distribution queues of the same country together, and drop national roll-ups when regional rows exist.
  • Forward horizons (e.g. Creos 2030 and 2035) and duplicate map layers are shown but not counted.
  • This is the first issue. From next month every figure comes with a change versus the previous reading, from our daily archive.

Full source list and update cadence: Sources and coverage. How totals are built: Methodology and FAQ.