Litgrid
Lithuania · 49 sites tracked · checked 5 h ago
Requested
6.4 GW
Generation 6.4 GW
Sites with none available
This operator does not publish available capacity per site
Sites
49
36 on the map
Sites with capacity available
—
Largest queues
330 kV Aizkrauklė-Panevėžys
connection point
1.0 GW
330 kV atš. Telšiai
connection point
786 MW
330 kV Jonava-Panevėžys
connection point
640 MW
n.i. (connection point not stated)
connection point
625 MW
330 kV Utena-Panevėžys
connection point
400 MW
330 kV Tytuvėnai-Kaunas
connection point
300 MW
Darbėnų SP
connection point
300 MW
Šyšos TP
connection point
300 MW
330 kV Kaunas-Jurbarkas
connection point
210 MW
Alytaus TP
connection point
205 MW